Ceiling and Walls getting painted

  Posted in Uncategorized on

  by albanyliquornet

Wall is up!!!

  Posted in Uncategorized on

  by albanyliquornet

Major achievement today. The wall dividing the stock from the retail sales floor is up.

Retail Front Windows Installed

  Posted in Uncategorized on

  by albanyliquornet

Before photo of what the building looked liked Rollup doors removed and retail windows installed

Cooler installation

  Posted in Uncategorized on

  by albanyliquornet

HVAC and Ducting being installed

  Posted in Uncategorized on

  by albanyliquornet

Sales Floor Framing

  Posted in Uncategorized on

  by albanyliquornet

We have made substantial progress in the last couple of weeks. Framing separating retail store front from stock room is complete. Rear rollup door is ready to be removed replaced by a double metal door. Walkin cooler parts shown on pallets. Here are some photos of the progress 🙂

Framing built for ceiling insulation

  Posted in Uncategorized on

  by albanyliquornet

First Step – pour concrete

  Posted in Uncategorized on

  by albanyliquornet

First step to fix the old floor by pouring 4″ of concrete. The new floor was poured on Aug 24th.

Existing store photos

  Posted in Uncategorized on

  by albanyliquornet

Here is what the existing space for the future location of Cork & Bottle, Albany Liquor store looks like…

Albany Store Floor Plans

  Posted in Uncategorized on

  by albanyliquornet

The current design of Corvallis will be integrated into our new Albany Liquor Store. Albany Architectural Drawing – click to see Allen & Laporte General Contractor of Albany and Saleem Noorani will be managing the project. Sales counters and cabinets design and construction by Santiam Cabinets The store will feature energy efficient LED lighting and …